Mr Murone/

Pave-Crete Constructions DID NOT FULFIL A SINGLE CLAUSE IN THE CONTRACT - NOT ONE

Below is the full contract in writing between me and

Mr Robbie Murone/

Pave-Crete Constructions

Included in quote are: All labour costs and hire of all machinery including hire of tip trucks and tipping fees.

 

  • Excavate and re-shape driveway to new levels.  Levels to be measured accurately before commencement to ensure correct drainage throughout.

 

  • Removal of all excess soil, rock and debris

 

  • Install strip grates commercial grade close to house and close to sliding gate and 2 x large pits 600 x 600mm along south east side of concrete area . 

 

  • Excavate and install 100mm PVC pipe and connect pits and grates to stormwater drainage at south east corner of house.

 

  • Excavate strip footings around perimeter of drive, pour concrete 150 – 200 mm in thickness with y12 steel bar in the concrete

 

  • Once footings are dry install brick edging side by side on a bed of mortar, grout to match grout on house. Bricks either old bricks matching house or ‘pressed reds’.

 

  • Once border complete and grout dry, prepare areas to be concreted, place crushed rock base 50mm thick and compact

 

  • Supply and place F72 steel reinforcement mesh in concrete leaving space for control/expansion joints. Reinforcement mesh to be raised on bar chairs throughout.

 

  • At control joints (every 2.5 m), discontinue steel reinforcement at a distance of 50 mm from the joint.  Install dowel bars 20 mm diameter of grade 250 steel placed at 300 mm intervals across joint.

 

WORK STOPPED HERE

 

 

 

FURTHER WORK TO BE DONE

 

  • Supply and pour 260 SQ M 100mm thick 28mpa exposed aggregate concrete (Montrose Standard), supplied by Mentone Pre Mix (18 – 20 Shearson drive Mentone)

  • CONCRETE RETARDANT to be sprayed evenly onto concrete to prepare for clean  24 hour later

  • Saw cut expansion joints where dowel bars were installed.

  • Pressure clean and acid etch surface pressure wash to create exposed aggregate concrete.

  • Clean and apply 2 x coats of clear sealer. Apply 2 coats of clear sealer

  •  Final clean-up of work zone.

Murone Pave-Crete Concrete Melbourne Stockland

Murone Pave-Crete Concrete Melbourne Stockland