Mr Murone/

Pave-Crete Constructions DID NOT FULFIL A SINGLE CLAUSE IN OUR CONTRACT - NOT ONE.

Yes, we got it in writing - click here:

Now compare the contract with what Mr Murone/Pave-Crete did.

CONTRACT

I

Contract: Excavate and re-shape driveway to new levels.  

Levels to be measured accurately before commencement to ensure correct drainage throughout.

Contract: Install strip grates commercial grade ... close to sliding gate.

Contract: Install strip grates commercial grade close to house

Contract: Prepare areas to be concreted, place crushed rock base 50mm thick and compact

Contract: Supply and place F72 steel reinforcement mesh in concrete leaving space for control/expansion joints

 Contract: ... leaving space for control/expansion joints.

Contract: Reinforcement mesh to be raised on bar chairs throughout.

Contract: At control joints (every 2.5 m), discontinue steel reinforcement at a distance of 50 mm from the joint.

Click buttons below to see

MR MURONE'S

WORK

Don't just believe me - read the

Independent Building Inspector's Report

Now for the big question:

 

HOW COULD MR MURONE FINISH THE JOB AFTER THE PREPARATION ABOVE?

 

Click here: