IF THE WORK HAD BEEN DONE RIGHT AT THE BEGINNING NONE OF THIS WOULD HAVE HAPPENED.

 

IT GETS WORSE

 

WE HAVE BIG LUMPS OF CONCRETE ALL OVER WHAT SHOULD BE OUR DRIVEWAY.

THESE LUMPS OF CONCRETE STICK UP OUT OF THE GROUND AS THESE PHOTOGRAPHS SHOW.

 

STICK UP ENOUGH TO INTERFERE WITH THE CONCRETE TO BE POURED.

MR MURONE PLANNED TO POUR CONCRETE ON TOP OF THESE HIGH LUMPS.

 

THIS WOULD RESULT IN THIN PATCHES OF FINAL POURED CONCRETE OVER THE LUMPS.

 

THIS WOULD CRACK.

 

IT WOULD ALSO RESULT IN UNEVEN SITE, UNEVEN CONCRETE LEADING TO INEFFICIENT DRAINAGE AND PUDDLING.

HAVE A LOOK AGAIN AT THE SITE LEVELLING ON WHICH MR MURONE WAS READY TO POUR:

Murone Pave-Crete Concrete Melbourne Stockland

Murone Pave-Crete Concrete Melbourne Stockland